Text Size
Beach Bike path delayed until fall

Bike path delayed until fall

Roger Blaylock, Santa Rosa County’s chief engineer and executive director for Navarre Beach, recently updated the Beach Beautification Committee on planned construction of a bike path across Navarre Causeway.

1_29_bikepath_text.jpg 

 Residents and officials met to discuss the status of

the bike path. From left, John Lewis, Chris Phillips,

Roger Blaylock, John Conner, Kenny Wilder, Jim

Taylor and Terry Wallace.

The news wasn’t what the committee wanted to hear: The project is delayed until fall.

 

For more on this story, see the Jan. 29 issue of the Navarre Press or subscribe online.

 

 

 

This article has been locked. You can no longer post any comments.

Top Videos

Banner
Banner
Banner
Banner
Banner
Banner
Banner
Banner
Banner

Check Stocks

1 DOW 12,454.83
-74.92 (-0.60%)    
2 S&P 1,317.82
-2.86 (-0.22%)    
3 NASDAQ 2,837.53
-1.85 (-0.07%)    

Twitter Updates

Loading...

Last 3 tweets from navarrepress:

Follow us on Twitter
Follow us on Twitter

Facebook Fans