Text Size
Beach Work begins on the causeway

Work begins on the causeway

The seawall along Navarre Causeway has needed repairs for several years.

5_21_causeway_text.jpg“The existing seawall has broken in several places and sand and rocks from the causeway are being eroded away,”  said project engineer Chris Phillips of Coastal Technology Corp. Coastal Tech is Santa Rosa County’s consultant for beach-, marine- and shoreline-related matters.

 

For more on this story, see the May 14 issue of the Navarre Press or subscribe online.

 

 

This article has been locked. You can no longer post any comments.

Top Videos

Banner
Banner
Banner
Banner
Banner
Banner
Banner
Banner
Banner

Check Stocks

1 DOW 12,454.83
-74.92 (-0.60%)    
2 S&P 1,317.82
-2.86 (-0.22%)    
3 NASDAQ 2,837.53
-1.85 (-0.07%)    

Twitter Updates

Loading...

Last 3 tweets from navarrepress:

Follow us on Twitter
Follow us on Twitter

Facebook Fans